Other
Dioki
During 2005. and at the begining of 2006. a plant for the production of polystyrene had been started and successfuly finished. Montelektro made a main electical, instrumental and Ex-zone project. A new equipment licensed by PST Worldwide from USA, had been built in. A control-operating system has been made also. Installation of electro and instrumentation equipment had been done, too.
After the adaptation the whole system can produce 16 000t EPS beads annually.
